Scope and execution
Top Dutos manufactures ducts, fittings and metal components according to the drawings, quantities and specifications received. Our team assesses the information needed for manufacturing and prepares a quotation for your project.
What must be defined
The client and the technical professional responsible for the project provide the system design and sizing. Top Dutos handles manufacturing and the services expressly specified in the proposal, with materials, dimensions, connections, quantities and delivery conditions identified.
Before releasing production, confirm the drawing revision and interface measurements. Changes must be communicated for assessment and adjustment of the supply.
Information needed to begin the assessment
- System purpose and description of the process served.
- Drawings, technical specifications and parts list, with revision identification.
- Airflow, positive or negative pressure, temperature and effluent characteristics.
- Materials, connections, insulation and surface protection.
- Equipment interfaces and space constraints.
- Inspection, documentation and acceptance criteria.
Coordination that prevents uncertainty on site
Connection dimensions, nozzle locations, component orientation, supports and assembly space must be checked. Field changes must be incorporated into the detailing before manufacturing is released. Using identified revisions reduces the risk of producing a component for conditions that have already changed.
Before cutting sheet metal, we check module sizes with the people who will move and install them. A longer section can eliminate a field joint, but it must fit through the site access. We compare installation time, freight costs and sheet metal yield to propose the lowest-cost option that meets the specification.
References appropriate to the application
Comfort air conditioning, industrial ventilation, kitchen exhaust and healthcare environments have different requirements. Standards must be selected according to their scope and the edition adopted in the project, checking for amendments and corrections.
SMACNA has separate publications for HVAC systems and industrial ducts. ABNT NBR 16401 covers air-conditioning installations; specific applications may require other references, such as NBR 14518 or NBR 7256. A generic list of standards does not replace the technical specification.
Submit your project
Send your files to [email protected], stating your company, project, city, required delivery date and requested services. The proposal must document deliverables, conditions, responsibilities and supply limits.
Specification references: SMACNA — technical publications · ABRAVA — standards references. Application depends on the design and the contracted scope.




