Scope and execution
Top Dutos handles requirements for industrial structures and metal components according to the drawings and scope provided. The supply must distinguish manufacturing, installation and responsibility for structural design.
Design comes before manufacturing
Spans, loads, support points and conditions of use must be defined. Structures supporting ducts or equipment must account for the weight of components, insulation and accessories, as well as loads applicable to the installation.
Equipment may introduce specific forces and vibrations. Outdoors, environmental exposure and wind loads must also be assessed by the responsible technical professional. Existing structures and anchors cannot be deemed suitable solely through an informal visual inspection.
Supply detailing
- Drawings and revisions released for manufacturing.
- Materials, profiles, sheets and dimensions.
- Bolted or welded joints and assembly details.
- Anchor locations, types and requirements.
- Surface preparation and protection system.
- Required inspections and documentation.
Finishes must be selected according to exposure and planned maintenance. Painting and galvanizing have their own specifications and should not be presented as equivalent for every environment.
References with the correct scope
ABNT NBR 8800 covers the design of steel and composite steel-concrete building structures. Mentioning it does not automatically cover every material, piece of equipment or structure type. The designer must select the standards and criteria appropriate to each case.
Welding, inspection and qualification requirements also depend on the design and contract. Referencing a standard does not replace the records and checks required for the supply.
Installation planning
The proposal must consider access, lifting, obstructions, execution sequence and any operating restrictions at the facility. Field changes must be assessed and approved before execution.
For a quote, send drawings, technical specifications, quantities and the project address to [email protected]. State whether manufacturing, installation or both are required. Design services and associated responsibilities must be expressly defined in the contract.